Photovoltaics (FVE / PV)
Ground-mounted and rooftop plants, from feasibility and connection capacity to commissioning.

Your local partner for energy investments in the Czech Republic
I help foreign investors, energy funds and developers find viable sites, understand the Czech market, build the business case and take PV, BESS, CHP and DC charging projects through grid connection, engineering and construction to commercial operation.
Who I work with
Market entry, local representation and a trusted technical voice on the ground.
Technical & regulatory due diligence, pipeline screening and asset acquisition support.
Site sourcing with grid capacity, permitting strategy and full project preparation.
Owner's engineering, delivery management and technology risk control.
Why you need a local expert
Grid capacity is scarce, connection procedures are specific to each DSO, and the legislation changes fast. What works in Germany or Spain doesn't automatically work here.
Identifying land with realistic grid capacity, zoning and landowner readiness — before you spend money.
CAPEX/OPEX, revenue stacking (spot, ancillary services, PPA), grid fees and sensitivity scenarios.
Connection (UPOS, UTP), permits, EIA, design coordination and EPC tendering.
Protection settings per PPDS Annex 4, BESS control, transformer lead times, MV routing, CHP grid behaviour.
Technologies

Ground-mounted and rooftop plants, from feasibility and connection capacity to commissioning.

Standalone and co-located storage, ancillary services readiness, grid code compliance.

Gas engines and heat integration, parallel operation with the distribution grid.

High-power charging infrastructure for e-mobility incl. MV connection and own substations.

Transformer stations, MV cable routes, switchgear and protection coordination.
Grid & regulatory expertise
Most project delays don't happen on site — they happen in grid connection queues and permitting. I know the current rules and the people behind them.

Energy Act, Lex RES, ERÚ decrees on connection and community energy — always the current wording.
Applications for connection (žádost o připojení), connection studies and capacity reservation strategy.
Technical conditions of connection, contract negotiation and fulfilment of DSO requirements.
Rules for parallel operation of generating units — protection settings, control, tests and trial operation.
How I work
Site, grid capacity, legislation and economics check.
Application, study, UTP and connection contract.
Coordination of designers, authorities and landowners.
Contractor management, site supervision, schedule and budget.
PPDS Annex 4 tests, trial operation, licence and handover.
On site





Let's talk about how to move it forward. A first consultation is free.